Home Products Dealers Wind facts About Info Cleaner world
 
spacer
spacer

Wes 18

Wes 30

Wes 30



 

WES History



The original design of the successful WES18 wind turbine is from the Dutch wind turbine pioneer Henk Lagerwey more than 25 years ago. In 2003 Lagerwey was the last Dutch wind turbine manufacturer that went out of business, due to changes in Dutch grants regulations. In 2004 Wind Energy Solution (WES) bought the exclusive rights, drawings and engineering files in order to give this unique turbine a second life cycle in specific niche markets. Where the original Lagerwey LW 18/80 wind turbine was installed mainly with farmers in The Netherlands, WES changed the control system and power conversion with modern remote monitored technology and continued to develop, support and sell this successful wind turbine in each continent under the name WES18.

The typical two-bladed rotor has an unique hinged system and a passive blade angle adjustment. This unique, robust mechanism guarantees a high efficiency and needs simple and little maintenance. The WES18  has proven to be a durable, reliable high performance wind turbine. The first turbines have been around since 1983, are still going strong and generate energy for their owners. The typical box shaped blue nacelle of the WES18 was designed in the early 80's of last century. Over 600 units of the WES 18 wind turbine have been installed around the world at (agricultural) businesses, universities, islands, small communities and at coastal and mountainous sites.